AJH Construction

Tub-to-Shower Conversions in San Jose

Replace a tub nobody uses with a walk-in shower in the same footprint. AJH Construction takes out the tub, reworks the drain and plumbing, waterproofs and tiles the walls and finishes with a glass door or panel, for homes across San Jose and the South Bay.

Walk-in shower with frameless sliding glass doors, beige marble-look wall tile, a mosaic tile floor, a tiled niche and a rain shower head with a handheld shower on a slide bar

A smaller job, a big change

Most conversions fit inside the old tub alcove. The tub and surround come out, the drain is moved and enlarged for a shower, the walls are waterproofed and tiled, and a glass door or panel goes in.

It is a smaller project than a complete bathroom remodel, and it changes how the room works every day, especially for anyone who finds stepping over a tub wall hard.

What's included

Tub removed and hauled away

The tub, surround and wall tile in the shower area come out and leave with us. Floors and the path through the house are protected first.

Drain and plumbing changes

The tub drain is enlarged to shower size and moved to where the new floor slopes. The valve moves up to shower height.

Waterproofed as one system

Backer board, a sloped shower pan and a continuous membrane on the floor and walls, flood-tested before any tile.

Tile walls and floor

Wall tile to the height you choose, up to the ceiling, and a shower floor tile rated for wet areas.

Glass door or panel

Frameless hinged, sliding, or a fixed panel with an open entry, measured after the tile so it fits exactly.

Permit and inspections

Moving the drain and valve is plumbing work. We pull the permit under our license and schedule the inspections.

Same alcove, a better shower

With the tub gone, the alcove has room for things a tub never had. Every AJH conversion can include:

  • A walk-in shower in the old tub footprint
  • A low curb, or no curb with the floor lowered
  • Shower valve and head moved up to shower height
  • Handheld shower on a slide bar
  • Built-in bench and a recessed niche
  • Blocking in the walls for grab bars
  • Tile to the ceiling and frameless glass
Keep one tub?

If this is the only tub in the house, we talk through what removing it means for your home and resale before you decide.

Front view of a tub alcove converted to a walk-in shower, numbered: 1 shower head at shower height, 2 valve moved up within reach, 3 handheld shower on a slide bar, 4 recessed niche, 5 grab bar with blocking in the wall, 6 built-in bench, 7 low curb, 8 glass panel and door, 9 tile to the ceiling. The toilet and vanity beside it stay as they are.
  • 1
    Shower head at shower height
  • 2
    Valve moved up within reach
  • 3
    Handheld shower on a slide bar
  • 4
    Recessed niche
  • 5
    Grab bar, with blocking in the wall
  • 6
    Built-in bench
  • 7
    Low curb, or no curb at all
  • 8
    Glass panel and door
  • 9
    Tile to the ceiling

Choose your glass

Glass is the last thing in. We measure after the tile is finished, so the door or panel fits the walls exactly.

Top view of a shower in a tub alcove with a fixed glass panel and a hinged glass door that swings out into the bathroom.

Panel and hinged door

A fixed panel at the shower head end keeps the spray in, and the door swings out into the room, so it needs clear floor in front.

Top view of a shower in a tub alcove with a sliding glass door: two panels that slide past each other.

Sliding door

Two panels slide past each other, so nothing swings out. A good fit when a swinging door would hit the toilet or the vanity.

Top view of a shower in a tub alcove with one fixed glass panel and an open entry, with no door.

Fixed panel, open entry

One panel and no door. It works when the shower is long enough to keep the spray inside; we check that at the layout stage.

Plan key: the hatched blue area is the shower floor, the light blue lines are the glass, the white circle on the side wall is the shower valve, the dashed curve is the door swing, and the arrows show the door sliding or the way in.

Our tub-to-shower process

One project manager coordinates every step, from the first measurement to the final walkthrough.

01

Consultation and measure

A free visit. We look at the tub, the floor and the plumbing access, measure the alcove and talk about how you use the bathroom.

02

Design and selections

Layout, tile, glass, valve and any bench, niche or grab bars, all planned together.

03

Permits

We pull the city permit and schedule every inspection.

04

Tub out, plumbing in

The tub and surround are removed and hauled away, then the drain and valve are moved for the new shower.

05

Waterproofing and tile

Backer board, a sloped shower pan and one membrane over the floor and walls, a flood test, then the tile.

06

Glass and walkthrough

Glass measured and installed after the tile. We walk the finished shower with you.

Tub-to-shower projects

Tub-to-shower photo 1

Suggested alt: walk-in shower with a low curb and frameless glass door where the tub used to be

Tub-to-shower photo 2

Suggested alt: the same bathroom before, with the old tub and shower curtain

Tub-to-shower photo 3

Suggested alt: converted shower with a built-in bench and recessed niche

Tub-to-shower FAQ

In most homes, yes. A standard tub alcove is about 60 inches wide, which is room for a comfortable walk-in shower. We measure at the first visit and show you the layout before anything is ordered.

If this is the only tub in the house, think about who may live there later, like a family with small children. We talk through what it means for your home and for resale before you decide.

Often, yes. A curbless entry means lowering the floor in the shower area so it can slope to the drain: a concrete slab is cut and lowered, and a wood floor is lowered or reworked. We check your floor at the first visit. A low curb is the simpler option when lowering the floor is not practical.

A tub drain sits at one end of the tub and is smaller than a shower drain. For the shower it is enlarged to shower size and placed where the new floor slopes to it, in the center or along a wall with a linear drain.

A frameless hinged door, a sliding door, or a fixed glass panel with an open entry, depending on the size of the shower. The glass is measured after the tile is finished so it fits exactly.

It is usually a shorter project than a complete bathroom remodel, because the walls, the layout and most of the room stay as they are. Your proposal includes a written schedule with the start date and the finish.

Yes. Moving the drain and the valve is plumbing work, so the conversion is permitted and inspected. We pull the permit under our license and schedule the inspections.

Ready to trade the tub for a shower?

Tell us about your bathroom and we’ll set up a free consultation.

Scroll to Top